Curriculum Website
Personal Information

Qualifications

Training

Skills

Qualities

Work Experience

Computer Skills

Languages

Additional Information

Desired Job

 
 
 

Curriculum Vitae


Personal Information

Name :  Daniel Kassa
Surname :  Gebremariam
Date of birth :  June 21, 1974
Nationality :  Ethiopian
Country of residence :  Ethiopia
State of residence :  Addis Ababa
County of residence :  Ethiopia
City/Town of residence :  Addis Ababa
Telephone 1 :  251911424185
Telephone 2 :  251910667803

Qualifications

Chief Topographer,  Municipal Engineer & Land Surveyor

Training

Advanced Diploma in the field of Urban Engineering from College of Urban Planning.(with cumulative G.P.A. of 2.83)

 

Skills

§ I have extensive knowledge and experience of using state-of-the-art Total Stations Electronic field books and their uploading & downloading software like:
                        Leica 600, 700 & 1000 Series
                        Geodimeter
                        Sokkia 2010Powerset Series
                        Sokkia Set2C, Set2B
                         South Totalstation
                        Topcon 200 ,300, 600 &700 series
                         SDR 31 & SDR 33 Electronic Field books
                         PSION Data collectors
                         Prism, Commsplus, Ticom, NTS-COM & Topconlink
§ Calibration of Totalstations and Leveling instruments.    
§ A very Good experience of working with Leica & Sokkia GPS (global Positioning System) Instruments and their processing soft wares (ski and Prism).

 

Qualities

Can work at any place, hardworker & able to cooperate with all workmates

 

 

Work Experience

March 2008  to date               Working as Freelancer Surveying Agent in different projects

 

)
·         CONSOLIDATED CONTRUCTORS INTERNATIONAL COMPANY / Ethiopia, Gambela/ in Gore – Gambela  project as a Chief Surveyor( March 2008 to Sep. 2008
·         BEST CONSULTING ENGINEERS at Different Surveying & Engineering projects in different parts of Ethiopia
                                                         + Arb Gebeya – Masha Road Design Project (175km) in northern Ethiopia
                                                       + Alaba – Lisana Road Design Project(50km) Southern Ethiopia
                                                       + Halale – Werabessa Hydro Electric & Dam project
                                                       + Giving training in Surveying & using Leica instrument for trainees from                            
                                                           Ministry of Urban Development of Ethiopia
June 2007 to April 2008         Salini Nigeria Limited / Nigeria, Abudja/ in Abudja Cultural Centre  & Millennium tower Project 

 

(CHIEF SURVEYOR )

 

 

Oct. 2003 to June 2007          Dragados J&P (Hellas) SA, Serving as a Chief Surveyor.

 

(CHIEF SURVEYOR & HEAD OF SURVEYING DEPARTMENT)
 Addis Ababa – Jima Road Rehabilittion Projec, 340 km (700 million birr cost)
Duties and responsibilities:                 
·         Control and Coordinate Surveying teams working in all sections of the project.
·         Computation of traverse and levelling of benchmarks
·         Preparation of design data for setting out of the alignment & implementation of layer levels (slope stake data).
·         Volume and quantity calculations.
·         Preparation of daily, weekly & monthly progress reports and programmes.
·         Participate in quantity calculations for payment certificates.
·         Preparation and checking of as built drawings & other as built measurements.
·         Road premarking and marking surveys.
·         Monitoring installation of sign posts, guide posts and guard rails.
·         Controlling setting out and construction of kerbs, culverts, bridges and RC drains.
·         Defining and choosing access road location.
·         Monitoring camp setting out and construction, crusher & batching plant layout, water supply & sanitary layout, etc.
·         Preparing site plan of borrow pits, camps and crusher locations.
·         Calibrating and minor repair of total stations and levelling instruments.
·         Responsible for hiring, monitoring and evaluating of surveyors, level men & other members of the department as well as making decision on matters connected to the department.     
April 2003 to Sep. 2003          ITAL Consult (Saudi Arabia)

 

                                                (Senior surveyor)

 

Took part in the surveying and data processing of;
·         GPS and Detailed Topographic survey of Yanbu – Alwajh – Duba road Project, 585 km (Saudi Arabia).
·         GPS and Detailed Topographic survey of Kemis Meshet – Sarat Abid – Zahran al Janub road Project, 180 km (Saudi Arabia).

 

May.1999 to April 2003         Saba engineering plc.

 

                                           (Senior SURVEYOR)

 

Took part in the following engineering projects.
·         Yarenja Housing Project for UN (near Ethio – Sudan boarder for Sudanese refugees
ü  Setting out of parcels & controlling construction activity.
·         Debrebrhan Stadium detail surveying & construction surveying.
·         Bole International Air Port (Participate in surveying activity of runway & Total fuel station extension work.
·         Ginka Low Cost Housing Project (Construction Supervision)
·         Irrigation projects around Adaba town.
ü  Preparing contour maps.
ü  Detailed Ground Survey
·         Mekoy –Milamille road project (12km)
ü  Location Survey
ü  Traverse survey
ü  Detailed Ground Survey
·         Chiriti – Majete road upgrading project (15m).
ü  Detailed Ground Survey
ü  Traverse survey
·         Aposto – Kibre Mengis and Negele _ MegaRoad upgrading project.
ü  Cross section Survey
ü  Traverse survey
ü  Took part in the preparation of design drawings
ü  Establishment of control points.
·         Diksis - Kula RR50 Road construction project - as a supervisor. Duties and responsibilities:
ü  Inspection of horizontal alignments.
ü  Staking out centrelines of road.
ü  Locating minor and major drainage structures.
ü  Preparing templates and long profiles.
ü  Inspecting all surveying and construction works.
ü  Checking volumes and quantities of earthwork and structures.
ü  Preparing Payment certificates
ü  Preparing daily and monthly progress reports.
·         Shehdi – Delego –Guba & Delego – Tewodros Ketema Road Design project.
ü  Location Survey
ü  Traverse
ü  Detailed Ground Survey
ü  Took part in preparation of design
ü  GPS survey
·         Yalo – Dalol  Road Design project (In association with FINROAD, a Finish based consulting company).
ü  Location Survey
ü  Traverse
ü  Detailed Ground Survey
ü  Took part in preparation of design
ü  GPs survey
·         Adet – Feres Bet Road Design project,120 km.
ü  Location Survey
ü  Traverse
ü  Detailed Ground Survey
ü  Took part in preparation of design drawings
·         Bahir Dar town asphalt road design project (total 15 km)
ü  Establishment of GPS and secondary control points
ü  Location Survey
ü  Traverse and level computation of primary & secondary control points.
ü  Detailed Ground Survey
ü  Took part in preparation of design drawings
·         Kafu Masindi Road Design project in Uganda.
ü  Checking Survey Data
ü  Plotting & Cad works
·         Gasay – Este  Road Upgrading project,30 km.
·         Keymebrat – Wogdi  Road upgrading  project,30 km..
·         Dubti – Asaita  Road upgrading  project (in the design surveying and later in the  design review & setting out for SATCON Construction).
·         Surveying of Historical Church places in Tigray area (in order to maintain without altering their historical appearance) 
ü  Abrha we Atsbeha church
ü  Petros we Paulos church
ü  Silase church
ü  Mariam church
·         Detail as built survey of Edget Yarn Factory for site plan preparation & additional building construction work (for BEST Consulting Engineers).
·         Gives training for Transport Construction & Design Enterprise surveyors
ü  Operation of Sokkia & Leica totalstation and it's data processing.
ü  Operation of Leica GPS and it's data processing.
ü  Operation of Sokkia digital level and it's data processing.
ü  Introduction to Liscad and commsplus software.
·         Detail surveying & Construction surveying of A.A College of Commerce and Engineering.(private college)
·         Setting out and Supervision of Condominium houses in different parts of Addis Ababa.
·         Different Bridge detail surveys (for MGM Consult) and Irrigation Projects (for Abay Engineering).

 

Nov. 1997 to April 1999        GTS CONULTING s.R.I.

 

                                                (SENIOR SURVEYOR & design aid)

 

Took part in the following engineering projects and served as Topographer and CAD operator.
·         Ogolcho - Meki Road Project
ü  Location Survey
ü  Traverse
ü  Detailed Ground Survey
ü  Took part in the preparation of design drawings.
·         Bekoji-Gobessa-Chole Road Project.
ü  Detailed Ground Survey.
ü  Data Preparation and Processing.
ü  Preparing contour maps.
ü  Staking out centre line of the road (for YENCOMAD Construction)
·         Diksis- Kulla Road Project
ü  Location Survey
ü  Detailed Ground Survey.
ü  Data Preparation and Processing.
ü  Took part in the preparation of design drawings
·         Agarfa - Medersho Road Project
ü  Location Survey
ü  Traverse
ü  Detailed Ground Survey
·         Bonga-Ameya-Chida Road Upgrading Project,125km(In association with   RENARDET Consult)
ü  Preparing Pre-markings for Photogrametry Survey.
ü  Traverse Survey
ü  Levelling
ü  Fixing control points for the Photogrammetry Survey.
ü  GPS observation on the pre-markings and post-markings.
ü  Preparing the Arial photographs for stereo plotting.
·         Kombelcha-MekaneSelam-GundeWein Road Upgrading Project,300 km (In association with RENARDET Consult)
ü  Served as a surveying team leader.
ü  Preparing Pre-markings for Photogrametry Survey.
ü  Traverse Survey
ü  Levelling
ü  Fixing control points for the Photogrammetry Survey.
ü  GPS observation on the pre-markings and post-markings and Primary & Secondary Traverse points.
ü  Preparing the Arial photographs for stereo plotting.
·         Serofta-Werka-Bedessa Road Project.
ü  Location Survey
ü  Detailed Ground Survey.
ü  Data Preparation and Processing.
ü  Took part in the preparation of design drawings
·         Langano Kersa Road Project.
ü  Location Survey
ü  Detailed Ground Survey.
ü  Data Preparation and Processing.
ü  Took part in the preparation of design drawings
·         Addis Ababa ring road phase I design project.
·         Gilgel Gibe I Hydroelectric & Power Project.
ü  Control survey of dam site.
ü  Access road setting out and other Detail Surveys
June 1996 – Oct. 1997          SPIE ENERTRANS (Bahir Dar – Mekele Power Transmission Line Project for EELPA)

 

                                                          (SENIOR SURVEYOR & CONSTRUCTION/ SITE ENGINEER)

 

Duties and responsibilities:

 

ü  Camp & office setting out and construction supervision.
ü  Flagging of the alignment as per the design.
ü  Setting out of Tower locations.
ü  Setting out for excavation of Tower legs (Stubs).
ü  Controlling Stub setting alignment and their levelling.
ü  Coordinating and supervising excavation, concreting & backfilling.
ü  Monitoring mounting of Stubs during erection of Tower.
ü  Monitoring of Cable installation (In order to keep the sag angle and minimum clearance of the power cable as per the design).

 

Sept. 1995 – May 1996          SOGEA (Mille - Assab Road Rehabilitation Project)

 

                                                           (TECHNICAL AGENT)

 

Duties and responsibilities:

 

ü  Site supervision
ü  Prepare as build drawings
ü  Topographic surveying
ü  Prepare material list and follow declining
ü  Prepare take of sheets
ü  Prepare work program reports

Computer Skills

§ A good knowledge of computer aided design and drafting soft wares like:
ü  SDR Mapping ver.6.5
ü  Inroads
ü  Stardust
ü  Clip
ü  Micro station
ü  AutoCAD
ü  Primavera project planning(2 months training)      
ü  Eagle Pont   
§ A good command of Application Soft wares like: Ms Excel, , Ms word and others.

Languages

Speaking                                 Reading                         Writing
Amharic                                  Excellent                        Excellent                        Excellent
English                                    Excellent                       Excellent                        Excellent
French                                    Good                             Good                             Good

Additional Information

Membership in Professional Societies:       AME/239 from the Ministry of Infrastructure (Design and Construction Supervision Office)/ Associate Municipal Engineer III/

 

ADDRESS                                            :     TEL.  (res.) 251113714764, Mobile 251911424185
                                                                        E-mail dani424185@yahoo.com & Dani424185@gmail.com

 

Desired Job

Land Surveyor, Construction Supervisor, Quality Controller, Office Engineer, Site Engineer
 
 
 
Diseño Página Web Online2005-2010