Additional InformationJob Description of recent job: 1. Creating and Analyzing Monthly Report 12RB that reporting electrical energy transfer from Power Transformator through feeders, and analyzing losses during it flows and the possibilities of disturbances in feeders as reported in monthly report of SAIDI/SAFI or Feeders Disturbances Reports. 2. Creating Monthly Report 12C that contains Entire Distribution assets of PT PLN (Persero) Cabang Solok and and the change of asset. 3. Creating and Analyzing Monthly Report SAIDI/SAIFI that reporting the number of Disturbance of Feeder in Working Area of PLN Cabang Solok and giving recommendation the solution in minimizing disturbances. 4. Monitoring and analyzing the use of Tool or appliance of Low Voltage Cable Line and Medium Voltage Cable Line and materials in units of PLN Cabang Solok, and has a due to stop giving the materials, in case, after being analyzed the materials given and the number of disturbances is not fitted. 5. Creating and reporting Transformator Load Measuring from Units and divide them into 3 category of load condition such as transformater who’s load are lower than 30%, load between 30 and 80% and load above 80%, and soon giving the report to Technical Manager of PLN Wilayah Sumbar. 6. Reporting the execution of P2TL (Investigation of the Abusement of Electrical Energy Using) in consumers side. 7. Member of Protection Team in PLN Wilayah Sumbar who has a role of maintaining protection devices and all electrical devices including electronic based electrical device in PLN Wilayah Sumbar including setting protection relay and coordinating among existing protection relays in every feeders so that the number of electrical energy transferred doesn’t take long time off therefore minimizing the number of consumers off. 8. Handle the distribution operation of electrical flow through the entire working area of PLN Cabang Solok. Planning the system of Electical Line Network at PLN Cabang Solok Wilayah Sumbar |